Trenching & Shoring RAMS

GroundworksTrenchingUKCDM 2015Draft v1
1

Scope of works

This RAMS covers trenching carried out by groundworks operatives on a UK construction or maintenance site. It sets out the method, the principal hazards and the control measures to be applied. Site-specific details (address, client, access, dates and supervisor) are completed for each job before the document is issued for principal-contractor review.

2

Sequence of works

  1. 1Obtain and review service drawings; scan and mark the area
  2. 2Set out exclusion zones and install support/battering as designed
  3. 3Excavate progressively, hand-digging near located services
  4. 4Inspect supports and atmosphere before any entry
  5. 5Backfill and reinstate; remove plant under banksman control
3

Hazards, risk rating & controls

Risk = likelihood × severity (1–25). Initial is before controls; residual is with controls applied.

Collapse of excavation / trench sides

Initial20Residual5

Who’s at risk: Operatives

  • Support system (trench box/shoring) or battering to a safe angle
  • Spoil and plant kept back from the edge
  • Daily inspection by a competent person and after any event affecting stability

Contact with underground services

Initial20Residual8

Who’s at risk: Operatives

  • Service drawings obtained; CAT & Genny scan before and during the dig
  • Hand-dig trial holes to locate and expose services
  • Safe digging practices (HSG47) followed throughout

Manual handling of materials and equipment

Initial9Residual3

Who’s at risk: Operatives

  • Mechanical handling/aids used where reasonably practicable
  • Loads assessed; team lifts for awkward or heavy items
  • Operatives briefed on safe lifting technique

Slips, trips and falls on the level

Initial6Residual2

Who’s at risk: Operatives, Other trades

  • Work area kept clear; good housekeeping enforced
  • Cables and hoses routed away from walkways
  • Spillages cleaned immediately; adequate lighting maintained
4

PPE

  • Hard hat
  • Safety boots
  • Hi-vis
  • Gloves
  • Eye protection
5

Competence

  • Competent excavation supervisor
  • CAT & Genny operator training
  • Confined space training where applicable

Schemes (CSCS, PASMA, IPAF…) evidence competence; they are not statutory requirements in themselves.

6

Permits & legislation

Permit to digConfined space entry permit where applicable
CDM 2015HSG47 Avoiding danger from underground servicesConfined Spaces Regulations 1997