Scope of works
This RAMS covers pitched roof work carried out by roofing operatives on a UK construction or maintenance site. It sets out the method, the principal hazards and the control measures to be applied. Site-specific details (address, client, access, dates and supervisor) are completed for each job before the document is issued for principal-contractor review.
Sequence of works
- 1Confirm access equipment is the right type for the task and ground conditions
- 2Inspect platform/scaffold/MEWP and record pre-use checks
- 3Establish exclusion zone and edge protection before work begins
- 4Carry out the work, maintaining three points of contact / safe platform discipline
- 5Lower materials under control; clear and inspect the area on completion
Hazards, risk rating & controls
Risk = likelihood × severity (1–25). Initial is before controls; residual is with controls applied.
Fall from height (edge, opening or access equipment)
Who’s at risk: Operatives
- › Avoid work at height where reasonably practicable; otherwise use a safe work platform
- › Edge protection / guardrails to open edges and openings
- › Access equipment inspected before use and at statutory intervals
- › Collective protection prioritised over personal fall-arrest
Falling objects / tools striking persons below
Who’s at risk: Operatives, Public, Other trades
- › Exclusion zone below the work; toe-boards and brick guards fitted
- › Tools tethered; materials not stored at open edges
- › Banksman/signage where the public could be affected
Manual handling of materials and equipment
Who’s at risk: Operatives
- › Mechanical handling/aids used where reasonably practicable
- › Loads assessed; team lifts for awkward or heavy items
- › Operatives briefed on safe lifting technique
Slips, trips and falls on the level
Who’s at risk: Operatives, Other trades
- › Work area kept clear; good housekeeping enforced
- › Cables and hoses routed away from walkways
- › Spillages cleaned immediately; adequate lighting maintained
PPE
- ✓ Hard hat
- ✓ Safety boots
- ✓ Hi-vis
- ✓ Gloves
- ✓ Fall-arrest harness where collective protection is not reasonably practicable
Competence
- ✓ Working at height awareness
- ✓ PASMA / IPAF / CISRS as appropriate to the equipment
- ✓ Harness and rescue training where fall-arrest is used
Schemes (CSCS, PASMA, IPAF…) evidence competence; they are not statutory requirements in themselves.